KLICKITAT PUD
WATER AND WASTEWATER RATES

 

 

System



Resolution #
Date Adopted

Connection Fee For

Standard Service

System Development Charge

Residential Base

5/8”x 3/4” Standard

Service

Block 1

0-8,000 gallons

Block 2 8,001-20,000 gallons

Block 3

20,001 gallons and over

Glenwood Water
Res. #1401
4/13/04

$994

 

$5,769

 

$17.00

 

$1.00

 

$1.30

 

$2.22

 

Glenwood Wastewater
Res. #1456 05/23/06

$819

 

$2,050(*)

 

$48.13

 

N/A

 

N/A

N/A

Klickitat Water
Res. #1454 05/23/06

$868

 

$3,042

 

$44.13

 

$1.00

 

$1.30

 

$1.60

 

Klickitat Wastewater
Res. #1455 05/23/06

$721

 

$1367(*)

 

$49.38

 

N/A

 

N/A

N/A

Lyle Water
Res. #1403 04/13/04

$938

 

$1,054

 

$20.48

 

$1.00

 

$1.30

 

$2.22

 

Lyle Wastewater
Res. #1403 04/13/04

$1,183

 

$1,481(*)

 

$54.59

 

N/A

 

N/A

N/A

Roosevelt Water
Res. #1414 06/08/04

$238

 

$610

$30.00

 

$1.00

 

$1.30

 

$1.50

 

Roosevelt Wastewater Res. #1414 06/08/04

$194

 

$550

$30.00

 

N/A

N/A

N/A

Wishram Water
Res. #1452 05/23/06

$812

 

$1,387

 

$28.42

 

$1.00

 

$1.30

 

$1.75

 

Wishram Wastewater Res. #1453 05/23/06

$749

 

$3,479

$42.35

N/A

N/A

N/A

Rimrock Water Res. #1415 06/08/04

$784

 

$460

 

$38.00

 

$1.50

 

$2.00

 

$2.50

 

Ponderosa Park Water
Res. #1451 05/23/06

$784

 

$1,817

 

$35.48

 

$1.17

 

$1.52

 

$2.60

 

Cliffs Water
Res. #1457 05/23/06

N/A

 

N/A

 

$100.00

 

$N/A

 

$N/A

 

$N/A

 

 

 

The above system development charges and residential base rates are for a standard residential service.  The base amounts for water shall be multiplied by the meter flow factor as stipulated below:  The base amounts for sewer shall be multiplied by the number of Equivalent Residential Units assigned to each customer by the PUD." 

 

Meter Size # of Meter
Equivalents
Meter Size # of Meter
Equivalents
5/8" X 3/4"14"25
1"2.56"50
1.5"58"80
2"810"115
3"1612"225

 

Note:

§         Connection fees for a meter service larger than five-eighths 5/8" x 3/4" (a standard service) will include the connection fee, plus the actual cost of materials and installation.

§         The System Development Charge is determined by multiplying the standard charge by the meter equivalency (MEs) factor.

(*) Service Development Charges are being adjusted for annual construction inflation estimates from the date of adoption to the present, as an interim step while engineering plans for future sewer facilities are under refinement. Once finalized, the DSCs will be recalculated to reflect adopted capital improvement programs.

 

 

 

 

 

 

 

 

Return to What's New

Please send your questions or comments to Kathy, Executive Assistant, or Contact Us
Last updated: 04/22/2008
Copyright © 2000 by Public Utility District #1 of Klickitat County
This is a secure web site, for the sole purpose of providing information to Klickitat PUD customers. Any information given to Klickitat PUD will not be used for any purpose other than it's intended use. We do not share our client information with mailing companies or telemarketing firms.

Site designed by